The Specific Operations Risk Assessment (SORA) has been the cornerstone for evaluating drone operations in the Specific category for years. This methodology, developed by JARUS, is now widely applied across Europe and beyond. With the release of SORA 2.5, significant updates have been made, based on practical experience with version 2.0. The new edition aims to provide greater clarity, better alignment, and a smoother process for both operators and regulators.

More Structure and Clarity

One of the most noticeable changes is in the way the documentation is structured. While SORA 2.0 sometimes caused confusion due to overlapping annexes, SORA 2.5 offers a clearer layout. The summary is now integrated into the main document, and a clear distinction is made between guidance and requirements.

The documentation that operators must submit is now explicitly defined. Applications must now always include an Operations Manual, a compliance matrix, and the official application form. This ensures applications are more consistent and easier to compare. Additionally, a recommended structure for the Operations Manual is now provided, further improving uniformity.

The process is also split into two phases: first, establishing the basic risks and assumptions, then providing evidence and the full safety case. This prevents operators from doing extensive work based on assumptions that may later prove incorrect.

From 11 to 10 Steps

The step-by-step plan has been revised: where SORA 2.0 had 11 steps, version 2.5 now has 10 more logically organized steps. For example, containment measures are now assessed before Operational Safety Objectives (OSOs), which aligns better with the logic of risk analyses.

Notably, the term CONOPS (“Concept of Operations”) has been replaced with Detailed Operational Information, including concrete templates and guidelines. This helps operators build their applications and safety cases more consistently.

Quantitative Approach to Ground Risk

The assessment of ground risks has been significantly updated in SORA 2.5. While SORA 2.0 relied mostly on qualitative estimates, the new version uses a quantitative model linked to population density and maximum speed. The distinction between VLOS and BVLOS no longer affects this step; any risk reduction must now be achieved through mitigations in step 3.

A new concept is the “critical area”: the zone in which people could be affected in the event of a crash. EASA has even developed a Critical Area Assessment Tool (CAAT) to allow operators to demonstrate that their actual risk is lower than the standard table.

Small drones benefit from clear advantages: drones ≤ 250 grams and ≤ 25 m/s automatically fall into the lowest risk category (GRC 1). Drones ≤ 900 grams and ≤ 19 m/s also benefit from relaxed requirements for certain mitigations.

New Classification of Mitigations

Options to reduce ground risk have been refined and divided into M1A (sheltering), M1B (operational limitations), M1C (ground observation), and M2 (impact reduction).

The previous Emergency Response Plan no longer counts as a risk mitigator but has been moved to the OSOs. This better reflects real-world practice and prevents operators from gaining unrealistic credit for paper plans.

Containment and OSOs Updated

Containment is now step 8 and plays a more significant role. It is determined based on maximum dimensions, speed, population density of adjacent areas, proximity to crowds, and the SAIL. Distinctions are made between Low, Medium, and High containment levels, providing a more standardized approach.

Operational Safety Objectives have also undergone substantial changes: the number of OSOs has been reduced from 24 to 17 by merging duplicates. The label “Optional” has been replaced with “Not Required (NR)” to avoid misunderstandings. A new feature of the OSO table indicates which party is responsible: the operator, manufacturer, or training organization.

Expanded Comprehensive Safety Portfolio

The final dossier, the Comprehensive Safety Portfolio, has been further developed in version 2.5. It must now include all evidence and procedures, as well as demonstrate how external service providers (such as U-space service providers) contribute to required safety levels via Service Level Agreements. This ensures the chain of responsibility is better documented.

Air Risk Assessment Remains Unchanged

For air risk assessment, little has changed for now. The existing framework remains, as a quantitative model will require more time. That update is planned for SORA 3.0, expected in 2027.

Importance for the Sector

SORA 2.5 represents an important step by JARUS toward more uniformity and transparency in drone operations. Operators gain a clearer and fairer framework, while regulators have more guidance when assessing operations. This also opens up room for sector growth without compromising safety.

It is still unclear whether operators with an Operations Manual based on SORA 2.0 must take immediate action or only update their procedures upon renewal or modification of their permit.

Further Information

For more details on SORA 2.5 and the precise changes, see:
• EASA: ED Decision 2025/018/R – AMC & GM to Commission Implementing Regulation (EU) 2019/947 — Issue 1, Amendment 3
• Robin Zuidhof (Drone Flight Company): Summary of changes – SORA 2.0 vs. SORA 2.5